Wayland Union School District was renovating their middle school and hired Control Solutions, Inc. to assist with the renovations. The project consisted of a new hot water system and chilled water system along with numerous mechanical equipment upgrades.
Control Solutions worked with the customer and engineering firm during the initial design and budget phase to ensure the old system integrated seamlessly to the existing and upgraded Control Solutions BAS system installed throughout the rest of Wayland's campus.