At the Meijer corporate headquarters, we executed a comprehensive building management system upgrade and installation encompassing all three corporate facilities, totaling 800,000 square feet. Additionally, we enhanced over 75 Meijer stores with complete building management system upgrades, ensuring efficient operations and customer comfort. In the Midwest, our team tackled building management system upgrades and installations across Meijer’s distribution centers, covering millions of square footage. These projects demonstrate our dedication to optimizing facility performance and supporting Meijer’s commitment to excellence in retail and distribution operations.
Projects
We pride ourselves on delivering modern solutions that redefine building automation. Each project showcased here represents a testament to our commitment to excellence, efficiency, and sustainability. From seamless integrations of advanced control systems to transformative upgrades that optimize building performance, our portfolio spans a diverse range of industries and customers.
Commercial Projects
Meijer
Customer Benefits:
- Improved Efficiency.
- Enhanced comfort and convenience for customers in the stores.
- Increased reliability and safety.
Accident Fund Vykon N4 Upgrade
In 2019, Control Solutions took on the transformation of replacing JCI NAE front ends with Niagara JACEs, modernizing building automation for enhanced efficiency and control. By seamlessly integrating Johnson Controls field controllers, we crafted a cutting-edge solution tailored to our client’s needs. The project extended beyond mere hardware replacement; it required thorough engineering to ensure seamless functionality and optimal performance. Additionally, our software engineers created new graphics to provide a user-friendly interface, empowering our client with intuitive control and real-time monitoring capabilities. This innovative approach not only modernized their system but also set the stage for future scalability and adaptability.
Customer Benefits:
- Provided the customer with user-friendly graphics.
- Enhanced efficiency.
- Improved control and monitoring.
Wesco Headquarters
Control Solutions, Inc. received the contract to manage the controls for Wesco Headquarters in Muskegon, MI. This project involved implementing a standalone JACE system integrated with Distech controls. Leveraging the Standalone JACE platform, we have empowered Wesco with unparalleled control over their building’s critical systems. This enables real-time monitoring and precise adjustments for optimal performance. Paired with Distech controls, renowned for reliability and adaptability, our solution ensures smooth integration. In return, this boosts operational efficiency and reduces energy usage. This project has fortified our client’s headquarters with state-of-the-art automation and laid the foundation for a sustainable infrastructure.
Customer Benefits:
- The need for intermediary JACE devices is eliminated.
- Communication over Ethernet is made effortless.
- Enhanced system responsiveness and efficiency.
Mitchell Creek Nature Preserve Project
The scope of this project encompasses the implementation of a LEED-certified initiative that incorporates advanced building automation technology to optimize sustainability and energy efficiency. Completed in Spring 2023, the project integrates multiple innovative systems aimed at reducing environmental impact and promoting renewable energy utilization. This showcases a holistic approach to sustainable building design and operation, leveraging advanced building automation technology, rainwater reclamation, geothermal heat pumps, and solar energy to minimize environmental impact and optimize resource efficiency. By embracing innovative solutions and meeting rigorous sustainability criteria, the project sets a precedent for environmentally responsible construction practices and contributes to a more resilient and sustainable built environment.
Customer Benefits:
- Solar arrays and geothermal heat pumps provide substantial long-term energy savings.
- Reduced environmental impact by incorporation renewable energy sources.
- Achieving LEED certification enhances the marketability and value of the building
Satorius
Mercantile Banck Corporation
Fredrick Meijer Gardens
Crain
Muskegon Convention Center
Wyoming Water Treatment Plant
Graphic Packaging International
West Community Credit Union
Art Mulder & Sons Trucking
WACO Aircraft Corp
Grand Rapids Aseptic Manufacturing
Lake Michigan Credit Union
Higher Education
Alma College
We’re proud to showcase our innovative integration of Distech ECY series controllers into an existing building automation system. Leveraging their cutting-edge capabilities and seamless Ethernet communication, we bypassed the need for intermediary JACE devices, streamlining the integration process. By directly integrating these controllers into the Niagara Supervisor, we achieved enhanced efficiency and flexibility in system management. This approach simplifies the system architecture. It also reduces hardware costs and maintenance requirements. Our commitment to delivering advanced solutions tailored to our client’s needs continues to drive our success in the realm of controls and building automation.
Customer Benefits:
- Simplified integration process streamlined the setup process for the customer.
- Direct integration allows for greater flexibility in expanding or upgrading the system in the future.
- Seamless compatibility.
Aquinas College Science Building
In 2021, Aquinas College received its largest individual gift donation to expand the science building. The project aimed to create a state-of-the-art facility that achieved LEED Gold certification. In addition to this project, Aquinas boasts 7 other LEED-certified buildings. Every detail we planned to ensure optimal performance and efficiency. This included integrating Lab Equipment with Phoenix Controls and implementing general HVAC systems with energy and heat recovery systems. Air Quality samplings were conducted using an advanced Aircuity System to maintain a safe and healthy indoor environment. Additionally, seamless integrations of lighting, utility monitoring, and generator switch gear highlighted a holistic approach to building management. With a focus on sustainability, comfort, and technological advancement, this project sets a new standard for modern construction. It promises unparalleled functionality and adaptability for years to come.
Customer Benefits:
- Sustainability
- LEED Gold Certified.
- Climate control in laboratories.
Alpena Community College
Since 2020, we’ve partnered with Alpena Community College, completing multiple Controls and TAB projects on their facility. Their campus now operates under complete control by Niagara, incorporating existing Stapha, JCI, and Distech Controls. Recently, we finalized the Van Lare Hall Renovation, a comprehensive building redesign encompassing rooftop units, VAVs, fin tube zones, cabinet heaters, a boiler system, and generator integration. Additionally, we supplied an N4 JACE system controller, graphics, system programming, warranty, and a 5-year software maintenance agreement.
Customer Benefits:
- Generator integration provides business continuity meaning that even during power outages, essential operations can continue.
- Compliance with regulatory requirements
- Comfortable space for college students
Monroe Community College
Atlanta Community College
Ferris State University
Kalamazoo College
Mid-Michigan College
West Shore Community College
Government
EC Brooks Correctional Facility Project
Located in Muskegon, MI, and sitting on 76 acres, the project at EC Brooks Correctional Facility highlights a comprehensive overhaul, transitioning from pneumatic controls to cutting-edge Direct Digital Control (DDC) systems. This encompassed a diverse range of facilities, including six dormitories, the Administration Building, School, Medical Center, Cafeteria, and Solitary Buildings. The upgrade involved a diligent process of replacing outdated pneumatic mechanisms with state-of-the-art DDC technology. This changes the way these buildings regulate their environmental systems. By embracing this transformation, the project not only ensures greater operational efficiency but also promises enhanced comfort, control, and adaptability across all spaces. This bold step towards modernization aligns with contemporary technological standards. It also signifies a commitment to providing optimal living, working, and learning environments for all occupants.
Customer Benefits:
- Occupancy comfort.
- Modernized control.
State of Michigan Geagley Labs Controls Project
Geagley Laboratory ranks as one of the top pesticides and food safety laboratories in the nation. Temperature control in the lab is necessary to guarantee product quality and sanitation. This project showcases a comprehensive controls upgrade that breathed new life into existing pneumatic controls and outdated DDC control systems. We primarily focused on enhancing the efficiency and functionality of the existing HVAC infrastructure. This initiative tackled various equipment, ranging from general HVAC units to specialized laboratory systems, all integrated with Phoenix controls. By modernizing these systems, the project not only optimized energy consumption but also improved the overall operational effectiveness of the HVAC setup. Through extensive planning and implementation, the upgrade ushered in a new era of precision control and adaptability, ensuring optimal climate management across various spaces while simultaneously aligning with contemporary technological standards.
Customer Benefits:
- Greater adaptability and flexibility to adjust settings according to changing needs in different spaces.
- Remote monitoring and control.
- Helped to regulate the airflow.
Brighton Fire
Michigan State Police
Allegan County Mental Health
Consumers Energy
Alpena County
Cotton Correctional
Ionia County ISD
City of Detroit – Adams Butzel Rec Center
K - 12
Alcona Community Schools
We’re excited to showcase this project where we implemented a comprehensive control system across two buildings. We seamlessly integrated Distech Controls with Niagara Supervisor to host HVAC controls and Key Card Access systems, providing efficient and centralized management for our client. Offering mechanical and HVAC control services, we collaborated closely with the district to modernize their outdated pneumatic system, converting it to fully Digital Direct Control (DDC). This upgrade not only improved system performance but also enabled the district to qualify for energy rebates, covering a portion of the project’s cost—between 10-15%—underscoring our commitment to innovative and cost-effective solutions.
Customer Benefits:
- Key card access enhances building security.
- Enhanced system performance of the HVAC equipment.
- Simplified facility management across multiple buildings.
Romeo Community Schools
Since 2019, we have collaborated actively with Romeo Community Schools to overhaul their Novar controls system. We introduced new control end devices, BACnet communication cabling, programmable controllers, and necessary JACE upgrades to support integrated controllers. This comprehensive upgrade seamlessly integrates into the existing Niagara 4 Web supervisor, granting the district’s facilities staff centralized access. Additionally, our Controls Team actively implemented power monitors across all facilities, ensuring protection against potential equipment damage from incorrect power inputs. Not stopping there, we installed a CO2 monitoring system at the bus/transportation garage, enhancing safety measures. Furthermore, CSI actively customized the lighting system for the football field, demonstrating its commitment to enhancing functionality across all aspects of the district’s operations.
Customer Benefits:
- Improved safety for students and staff.
- Enhancement of overall experiences.
- Enhanced system performance and efficiency.
Northview Public Schools
At Control Solutions, we take immense pride in our collaborative efforts with educational districts, where our comprehensive building automation solutions have revolutionized the way schools manage and optimize their facilities district-wide. Northview Public Schools is no exception to this. We have provided HVAC integration to new units in all elementary and middle schools in the district. Our software engineers have upgraded existing HVAC graphics for various existing building automation controls at the high school as well. These upgrades have allowed for ‘old’ buildings to function like “new” buildings again!
Customer Benefits:
- Enhanced comfort for students and staff.
- Flexible zoning and control.
- Enhanced environmental sustainability.
Jenison Public School District Improvement Projects
Over the past few years, we have worked closely with Jenison Public Schools on their buildings, old and new, to seamlessly integrate building automation systems into a single user interface. Our most recent project at the El Puente Elementary/ECC and Jenison Center for the Arts Buildings was no exception. Through planning and leveraging cutting-edge technology, we simplified operations. It also provided enhanced control and visibility across all facilities within the district.
Key highlights of our solution include providing HVAC controls and integration services as part of a multi-year mechanical renovation initiative. This ensures efficiency and energy savings through centralized control mechanisms. It offers an intuitive user interface for proactive management and decision-making. Additionally, it designs a future-ready infrastructure capable of accommodating expansions and technological advancements seamlessly. Moreover, it implements HVAC controls for the new Multi-purpose Athletic Facility. The successful integration of these building automation systems has introduced a new era of efficiency and convenience for the facilities. This exceeds client expectations and sets a new standard for building automation excellence.
Customer Benefits:
- Enhanced efficiency and energy savings.
- Intuitive user interface for proactive management.
- Scalable and future-ready infrastructure.
Grand Blanc Public Schools
Corunna Public Schools
East Jackson Schools
Rudyard Area Schools
Maple Valley Schools
Rochester Community Schools
Hale Area Schools
Elk Rapids Schools
Belding Public Schools
Hillman Public Schools
Grand Rapids Public Schools
Chelsea Public Scools
Caledonia Public Schools
Healthcare
Henry Ford Macomb Hospital
Our team installed Variable Air Volume (VAV) controllers in the recently renovated North Tower Lower Level On Call Suite to enhance HVAC control, aiming to optimize climate regulation and ensure comfort and efficiency for staff and patients. Additionally, we focused on implementing supplemental heating systems in the Generator Room to meet stringent life safety standards, guaranteeing optimal temperature levels crucial for building integrity and occupant safety. Furthermore, we demonstrated our dedication to service excellence by validating functionality, calibrating, and replacing temperature and humidity sensors as needed in our critical environment sensor updates project. This comprehensive approach prioritized patient safety and comfort during procedures across critical environments throughout the hospital, reaffirming our commitment to delivering excellence in healthcare infrastructure.
Customer Benefits:
- Improved patient comfort by ensuring precise temperature and humidity control.
- Enhanced safety standards.
- Efficient procedure environments.
MyMichigan Health Center
Control Solutions, Inc. operates a comprehensive control system throughout the entire 600,000-square-foot building, leveraging cutting-edge technology from Niagara, JCI, and Distech. With a dedicated presence on-site each week, we provide essential service work, focusing particularly on mechanical and HVAC control. Notably, this client represents the cornerstone of our operations in the Northern Branch. An exciting development in our collaboration with this esteemed client involved the completion of a significant expansion project: the construction of a three-floor expansion dedicated to inpatient and surgical facilities. This expansion, completed in Spring 2022, marked a milestone in our partnership and demonstrated our capabilities in managing large-scale projects.
Customer Benefits:
- Improved operational performance.
- The expanded facilities offer superior comfort and energy efficiency.
Bay Mills Medical Health Center
Control Solutions, Inc. secured a contract to deliver comprehensive building temperature control solutions for the Bay Mills Health Center project. Over two years, we oversaw the installation of various building automation systems across the new 35,000 sq ft building. This encompassed setting up 11 in-floor heat zones with pumps and installing two Air Handling units, a Boiler and Chiller System, VAVs with hot water, Exhaust Fans, Humidifiers, a Domestic Water System, and a Heat Trace System. Our scope of work also involved system programming, implementing graphics, conducting system start-up and check-out, providing owner training, supplying computer equipment, and offering warranty services.
Customer Benefits:
- In-floor heating systems reduce the spread of airborne contaminants and promote a healthier indoor environment
- Provides heating zones to customize temperature controls in different areas to adjust to specific patients’ needs.
- In-floor heating systems operate quietly, which can contribute to a peaceful and restful atmosphere in hospital rooms and common areas.
Cytiva
Viant Medical
Fox Run
McClaren Northern
Trinity Health
Industrial
Whirlpool Corporation
With over one hundred successful projects in our portfolio, we’ve helped Whirlpool implement cutting-edge solutions to enhance its facilities. In Joliet, Illinois, we executed a complete building management system upgrade and installation, ensuring optimal efficiency and performance. At the Saint Joseph Technical Center, we created the building management system of a state-of-the-art technology center, adding 158,000 square feet of innovation space. Our team also implemented a campus-wide upgrade to the Niagara 4 software and graphics system, streamlining operations across multiple locations. In Atlanta, Georgia, and Orlando, Florida, we tackled building management system upgrades and installations, including specialized Dehumidification Control systems, for facilities spanning over 556,000 and 165,000 square feet, respectively. These projects showcase our commitment to delivering excellence and driving technological advancements in partnership with Whirlpool. Whirlpool focuses on sustainability and corporate social responsibility, and here at Control Solutions, we aim to help them achieve that goal in-house as well.
Customer Benefits:
- Dehumidification control helps to reduce humidity levels, thereby inhibiting mold and mildew growth.
- Enhanced comfort.
- Reduced downtime and maintenance.
Besser Company World Headquarters Controls Upgrade
We proudly manage all mechanical and HVAC control service work for this prominent building, located in Alpena, MI. We help to assure optimal performance and efficiency in their temperature controls throughout the manufacturing plant. In addition, we successfully implemented an all-encompassing building automation system using Niagara technology paired with Distech controls. This large-scale project included the integration of 16 AHUs, along with the installation and optimization of a chiller system and a boiler system.
Magna Exteriors
At Magna Exteriors, in Holland, MI, we seamlessly integrated multiple JACEs with Johnson Controls controllers, extending our reach to encompass third-party systems. Beyond standard HVAC controls, our expertise spans critical Plant Operation systems like compressed air and reverse osmosis. Through meticulous engineering and strategic integration, we’ve established a cohesive automation ecosystem that optimizes efficiency and performance across all fronts. Our solution offers control and visibility, empowering real-time monitoring and precise adjustments to meet the evolving needs of commercial operations. We are committed to delivering innovative automation solutions that drive success in diverse industrial markets.
Lacks
ii Stanley
Detroit Diesel
Roscam
Henkel
Alro Steel Corportion
Test & Balance
Ferris State University — Virtual Learning Center
Control Solutions completed the Testing & Balancing of air and hydronic systems for a university’s state-of-the-art virtual learning center. With close attention to detail, we calibrated these critical systems to ensure optimal performance and efficiency within the innovative learning environment. Our work encompassed testing and balancing HVAC systems to maintain consistent airflow and temperature control, creating a comfortable and conducive atmosphere for students and educators engaged in virtual learning experiences. By achieving precise balance in hydronic systems, we facilitated efficient heating and cooling throughout the facility, supporting uninterrupted educational activities regardless of external conditions. Our commitment to excellence in testing and balancing has played a pivotal role in fostering a dynamic and adaptable learning environment, empowering the university to deliver high-quality education in a digitally driven landscape.
Customer Benefits:
- Enhanced learning environment — students can focus more effectively on their studies without distractions caused by uncomfortable temperatures or poor air quality.
- Consistent temperature control and airflow help maintain the performance and reliability of digital equipment, facilitating uninterrupted virtual learning experiences.
- Maintaining optimal indoor air quality and temperature control supports the overall health and wellness of students, faculty, and staff.
Gerald R Ford Airport
Embarking on a significant project within the aviation industry, we recently completed the Testing & Balancing of air and hydronic systems for a concourse addition at a Gerald R Ford airport. With precision and expertise, we calibrated these critical systems to ensure optimal performance and efficiency within the expanded concourse area. Our work encompassed testing and balancing of HVAC systems, ensuring consistent airflow and temperature control to enhance passenger comfort and safety. By achieving precise balance in hydronic systems, we facilitated efficient heating and cooling throughout the new concourse, regardless of its size or layout. Our commitment to excellence in testing and balancing has played a vital role in supporting the seamless operation of the airport, contributing to a positive travel experience for passengers and staff alike.
Customer Benefits:
- Contribution to the smooth operation of the airport terminal, minimizing disruptions and delays that can impact passengers’ travel experiences.
- Enhanced safety.
- Esurance of consistent airflow and temperature control throughout the concourse.
Trinity Health Partners
Control Solutions recently executed Testing, Balancing & Certifications of crucial room pressurization systems at Trinity Health Partners. This ensures the optimal functionality of these systems is paramount in healthcare settings, where maintaining precise air pressure differentials is vital for infection control and patient safety. With careful attention to detail, our skilled technicians calibrated these systems to meet stringent regulatory standards and industry requirements. By achieving precise room pressurization, we’ve created a safe and sterile environment within critical areas. This includes operating rooms, isolation rooms, and cleanrooms. Our commitment to excellence and expertise in healthcare facility testing and balancing has played a pivotal role in safeguarding the well-being of patients, staff, and visitors alike.
Customer Benefits:
- Precise room pressurization helps prevent the spread of airborne contaminants and pathogens, reducing the risk of healthcare-associated infections (HAIs) and protecting patients, staff, and visitors.
- Regulatory compliance — Meeting regulatory standards and industry requirements for room pressurization is essential for healthcare facilities to maintain compliance with health and safety regulations.
- Well-balanced room pressurization systems operate more efficiently, reducing energy consumption and operational costs for healthcare facilities.
4 Winds Casino & Hotel
For this project, we precisely executed the Testing & Balancing of both air and hydronic systems, ensuring optimal performance and efficiency. Our dedicated TAB team calibrated these critical systems to meet the unique demands of these high-profile structures, delivering unparalleled comfort and air quality for guests and patrons alike. From the intricacies of the gaming floor to the complexities of a multi-story hotel, our commitment to precision and excellence shines through in every aspect of our work. We’re proud to have played a crucial role in bringing these iconic buildings to life and ensuring they meet all the regulatory standards.
Customer Benefits:
- Improved air quality.
- Well-balanced systems operate more efficiently, reducing energy consumption and potentially lowering utility costs for the property owners.
- Consistent performance.
GRPS Innovation Central Highschool
Lansing School District
Jenison High School
Ludington HS/MS
Bay Mills Hotel & Resort
NAVFAC Marine Center
Mercy General Health Sherman
Grand Rapids Public Schools
Michigan State Police
Lazydays Service Center
Greenville Public Schools
McLaren Cheboygan
Kalamazoo County Downtown Justice Center
Central Montcalm Public Schools
Mercy Health Hudsonville
Aquinas College
Fruitport High School
Embassy Suites
Lake Michigan College